The GEAR Building
Specifications

Plot at Changi Business Park

0 sqm

Gross Floor Area

0 sqm

Across 6 Floors

0 pax

Invested to Develop The Building

$ 0 million

Building Construction Timeline

Aug 27, 2020

Groundbreaking

Aug 27, 2020
June 17, 2022

Topping Out

June 17, 2022
Mar 31, 2023

TOP

Mar 31, 2023
Aug 4, 2023

Grand Opening

Aug 4, 2023

Kajima Lab for Global Engineering, Architecture & Real Estate
The GEAR Building

BLUEPRINTS OF VISION

blank

Keisuke Koshijima

Executive Vice President, Kajima Corporation
Managing Director, Kajima Asia Pacific Holdings

The GEAR is more than a building – it’s a living lab where bold ideas meet real-world challenges. As our first overseas R&D hub, it fosters close collaboration with industry partners to co-create solutions for the region. From Singapore, we’re accelerating innovation that blends frontier technologies with practical impact – shaping a smarter, more resilient future.

Shuichi Oishi

Managing Executive Officer, Kajima Corporation
Chief Executive Officer, Kajima Development

Shuichi Oishi

Managing Executive Officer, Kajima Corporation
Chief Executive Officer, Kajima Development

Our journey in Singapore began over 60 years ago — and with The GEAR building, we deepen that legacy. More than a headquarters, it is a regional anchor for long-term growth, meaningful collaboration, and lasting impact. Guided by Kajima’s values, this project reflects our commitment to building enduring partnerships that shape the future of the built environment in Singapore and beyond.

blank

AWARDS ACROSS WHAT MATTERS MOST

The GEAR building redefines the workplace as a smart, sustainable, and human centred environment. As Kajima’s regional headquarters, it blends research, innovation, and design excellence to support collaboration and adaptability. Recognised with both BCA Green Mark Platinum and WELL Platinum certifications, The GEAR exemplifies responsive architecture that learns from its users, integrates nature, and sets a new standard for high performance and future ready spaces.

Living Lab: Exploration, Experimentation, Co-creation

Born from Kajima’s nearly two centuries of excellence in the built environment, The GEAR stands as a bold step into the future—an innovation engine built to tackle tomorrow’s challenges, today.
blank

The lab conducts research and development of new construction production methods with the use of robots that contribute to increased productivity. It has a two-storey atrium enclosed by firerated glass and is envisioned to test utilisation of drones at the construction site in the future.

The lab conducts research and experiments on wastewater treatment, waste-toenergy technology, and urban greenery by utilising various functions of living organisms and engineering methods. It consists of the microorganism lab, green infrastructure lab, and chemical analysis lab. Small-scale experiments and chemical analysis will be conducted for optimum design in large scale plants and systems.

The lab conducts research activities mainly on two focus areas – sustainable materials (mainly for concrete materials and geotechnical engineering) and advanced sensing technologies used for buildings and infrastructure projects (fiber optic sensing, satellite sensing, wireless sensors). It also provides engineering services related to concrete and soil engineering (technical consultation), and review of site investigation and numerical simulation.

The Digital Tech Lab conducts research on occupant well-being, energy efficiency, and smart facility management using anonymised and consent-based data. Supported by over 2,000 IoT sensors and advanced tools such as a multi-screen visualisation board and high-performance computing, the lab explores how digital technologies can enhance building performance. All activities are guided by local regulatory requirements and data ethics.

The lab provides natural ventilation and flexibility for different conditions, expect more than majority of the time that the windows are open to reduce energy consumption. Biophilic spirit with the indoor trees and green design. Timbre-based flooring material to enrich the surrounding and soften the ambience to provide a relaxing space for occupants.

Interested in visiting The GEAR Building?

Location: 19 CHANGI BUSINESS PARK CRESCENT Singapore 489690
blank

Construction Robotics Lab

The lab conducts research and development of new construction production methods with the use of robots that contribute to increased productivity.
It has a two-storey atrium enclosed by firerated glass and is envisioned to test utilisation of drones at the construction site in the future.